Coventry log home in Carollton MO
Built in the months of Dec, Jan and completed up in Feb during the polar vortex ! Ice cold conditions as far south as Mo. Below zero wind chills were common. Shorter days and taking off for Christmas delayed the construction of this large beautiful home. Over 106 feet long it is true majesty.
608 547 4129 for costs on building your log home
|
Jeramey , takes log siding off of fork lift |
|
Deload? Trusses for attic garage so second floor can be added |
This is a rather fun shot, the outside tips on its side, and we have the grammar error on the trusses Deload, not unload. Roof is half completed , garage is framed. Patriot log Home builders will build your home in the winter months , you need your foundation however.
|
framing for half log siding of garage |
LONG LOVELY LOG home
|
building in the winter months , cold ! but this home is nearly completed in its dry in stage |
|
Nice dormers and front porch |
|
under porch view and dove tail , wonderful porch for hot summer days to cool off while sitting on that home made rocking chair , dreamy. |
|
close up of underside of porch beams |
|
backside of home walk out basement with porch. This is the way to design |
|
inside framing of walls which will be drywalled |
|
windows under the porch gable, trapezoids a very nice touch on a log home |